Indian Railway Codes and Manuals-Finance code-Vol-I-Chapter- 7 (VII)
CHAPTER-VII
Allocation Of Expenditure General Principles of Allocation
701.
General Principles of Allocation
-'Allocation' of expenditure implies identifying its source of Finance and
should be distinguished from 'classification' which deals with the detailed
heads of account under which expenditure is recorded in the accounting books of
the Railway. Railway expenditure is financed from Capital provided by the
General Revenues, Railway Funds, Extra Budgetary Resources (Institutional
Finance) (EBR/IF), EBR (IRFC-Bonds) and Extra Budgetary Resources (Partnership)
(EBR/P) and Current Revenues. Accordingly, the expenditure is allocated to (i)
Capital, (ii) the Depreciation Reserve Fund (iii) the Development Fund, (iv)
EBR/IF (v) EBR(IRFC-Bonds), (vii) EBR/P (viii) Railway safety Funds (ix) other
specific fund and (x) Revenue. The detailed classification of (a) the expenditure
chargeable to Revenue is given in Appendix I, and of (b) Capital and other
Works Expenditure is given in Appendix II. The classification of revenue is
given in Appendix III. {Appendices I to III are printed as a separate volume
vide Financial Code Volume II). The List of Major and Minor Heads of Accounts
of Railway Revenue, Capital, Debt and Remittance Transactions adjusted in
Railway Books are, however, given in Appendix IV of Indian Railway Code for the
Accounts Department. Appendices I to III referred to in para 701 are in
replacement of Appendices I to III of General Code Vol. II.
702.
The general principles on which railway expenditure should be allocated between
the sources of finance mentioned in the preceding paragraph are described in
paras 703 to 715 below. These principles are based on the recommendations of
the Railway Convention Committee, 1949, as amended from time to time.
703.
Capital bears - 1) the cost of land as defined in paragraph 717 except in cases
provided in paragraphs 718 and 719 ; 2) the first cost of constructions and
equipment of (i) new lines including strategic lines, whether remunerative or
unremunerative and (ii) new production units; 3) the cost of maintaining a
section of the line not opened for working; 4) the cost of any additions to the
line or equipment of the line, when it is not chargeable to Development Fund;
5) the cost of any additional plant and machinery not connected with any
specific work; and 6) the cost of any tools and plant specifically purchased, and
of any posts specially created for the supervision or construction of a work,
in 3 accordance with the provisions of paragraph 776. 7) the capital component
of IRFC lease charges. (Note -Provided that the capital component of IRFC lease
charge shall be charged to Capital, if adequate funds are not available under
Capital Fund. However, the above payment shall be the first charge on Capital
Fund if sufficient funds are available.) (Authority: Board's letter no.
2002/AC-II/1/3 dated 25.07.2017) 8) Cost of construction of staff quarters.
(Authority- Board's letter no. F(X)II-94/ALC/3 dated 05.05.1995) 703 A. Capital
fund bears – 1) The capital component of IRFC lease charges (Provided that the
capital component of IRFC lease charge shall be charged to Capital, if adequate
funds are not available under Capital Fund.) 2) All other expenditure
chargeable to Capital Fund as per allocation projected in yearly Pink Book.
Note - i) The booking of expenditure on Capital and Capital Fund from 1998‐ 99
onwards is to be done as per allocation indicated in yearly Pink Book. ii) In
case of on‐ going works for which source of allocation is changed in the
intervening years,booking already made shall be frozen. iii) Inventories will
continue to remain under GBS portion of Capital. (Authority: Board's letters
No. 93/AC‐ 1/1/1 dated 26.07.1995, F(X)II/93/ALC/1 dated 24.11.1997 and
2002/AC‐II/1/3 dated 25.07.2017)
704.
Capital is credited with - 1) the cost at debit of Capital of an asset (other
than land) which is abandoned or disposed of without being replaced ; Note – i)
When such an asset is subsequently replaced, the adjustment made under these
rules is reversed provided the cost of replacement is chargeable to the
Depreciation Reserve Fund according to paragraphs 754 and 755, otherwise the
reversal adjustment should not be made, but the cost of replacement should be
allocated according to the normal ruler as if it were a new work ii) When an
item of rolling stock is replaced by another of less 4 tractive power, seating
capacity or floor area or carrying capacity as the case may be, the new asset
cannot be held to render fully the services for which the old asset was
intended and to the extent to which the new stock falls short of the
requirement in this respect, the old stock should be considered to have been
abandoned, and the credit for the proportion of the original cost thereof
afforded to Capital. 2) the sale proceeds of any land acquired at the cost of
Capital when it is sold or surrendered; 3) the difference between the cost at
debit of Capital of a replaced asset (other than an asset mentioned in item (5)
below) and the cost of replacement, when the cost of replacement is chargeable
to the Depreciation Reserve Fund ,(vide paragraph 755) and is less than the
cost at debit of Capital; 4) the cost of labour originally incurred in laying
the assets or parts thereof, when such items are subsequently transferred for
use on a new work; 5) the original cost at debit of Capital (estimated if not
known) of an asset (falling within the categories mentioned in Note 2 to
paragraph 711) replaced at the cost of the Depreciation Reserve Fund.
704
A. Capital Fund shall be credited with: 1) the amount out of the surplus after
appropriation to Development Fund. 2) the cost at debit of Capital Fund of an
asset which is abandoned or disposed of without being replaced; Note - i) When
such an asset is subsequently replaced, the adjustment made under these rules
shall be reversed provided the cost of replacement is chargeable to the
Depreciation Reserve Fund, otherwise the reversal adjustment should not be
made, but the cost of replacement should be allocated according to the normal
rules as if it were a new work. ii) When an item of rolling stock purchased
from Capital Fund is replaced by another of less tractive power, seating
capacity or floor area or carrying capacity as the case may be, the new asset
cannot be held to render fully the services for which the old asset was
intended and to the extent to which the new stock falls short of the requirement
in this respect, the old stock should be considered to have been abandoned, and
the credit for the proportion of the original cost thereof afforded to Capital
Fund. 5 3) In case of assets referred to in Note (ii) of Para 703 A, the assets
so created as and when retired will be retired by credit to the source from
which it was created and where the charge was booked to Capital as well as
Capital Fund, the credit will be in the proportion of the charge. 4) The
difference between the cost at debit of Capital Fund of a replaced asset (other
than an asset mentioned in item (6) below) and the cost of replacement, when
the cost of replacement is chargeable to the Depreciation Reserve Fund, and is
less than the cost at debit of Capital Fund; 5) The cost of labour originally
incurred in laying the assets or parts thereof, when such Items are
subsequently transferred for use on a new work; 6) The original cost at debit
of Capital Fund (estimated if not known) of specified asset replaced at the
cost of the Depreciation Reserve Fund; and Amount of interest earned on the
balance of fund. (Authority: Board's letter No.93/AC-I/1/1 dated 26.07.1995,
F(X)II-93/ALC/1 dated 12.05.1993, and F(X)II/93/ALC/1 dated 24.11.1997)
705.
Revenue bears - 1) All charges for maintenance and repairs after opening of the
line for traffic, other than charges of the nature detailed in paragraph 727,
including the current expenses of conducting the business of a railway, e.g.,
pay, allowances, etc., of establishment employed on the open line; 2) The
contribution made to the Depreciation Reserve Fund under paragraph 710 to meet
the cost of replacement and renewals of assets; 3) The cost of such
replacements and renewals as are not chargeable to the Depreciation Reserve
Fund or the Development Fund under paragraphs 758 and 711; 4) The cost of
labour originally incurred in laying the assets or parts thereof at the cost of
Capital, when such items are subsequently transferred for use on a new work; 5)
The cost of additional pitching stone laid in training works and protective
works after the completion of such works; and 6) The cost of procurement on
additional account of small items of equipment, including medical equipments
apparatus, appliances including instruments and accessories for Railway
Hospitals and Dispensaries as also the cost of replacement of these items
provided the cost does not exceed Rs. 3 lakh per item or the monetary limit as
prescribed by Board from time to time. These powers should be exercised with
great 6 circumspection and justification for the purchase thoroughly examined
so as not to place an undue burden on Revenue. In cases where (i) cost of an
item of medical equipment exceeds Rs 20,000/- (or the monetary limit prescribed
from time to time) and (ii) cost of an item other than medical equipment
exceeds Rs 10,000/- (or the monetary limit prescribed from time to time) the
powers should not be re-delegated below the level of Heads of Departments. Note
-In the context of provisions contained in sub-para (3) read with para 758(4),
replacement of all items included in the list below para 758 (4) is to be
allocated to Revenue, irrespective of the cost involved.
706.
Revenue is credited with the value of material released from works charged to
Revenue and the amount realized from the disposal of an asset, after deducting
the incidental charges, e.g., the cost of dismantling, handling and shifting,
including freight to stores depot.
707.
Deleted
708.
Revenue is credited with the amount realized from the disposal of an asset without
being replaced, the original cost of which has been charged to Open Line
Works-Revenue.
709.
Depreciation Reserve Fund bears - 1) The cost of replacements and renewals
including the cost of dismantling, handling and shifting including freight to
stores depot in accordance with the provisions of paragraphs 753 to 755 and 758
2) The cost of replacement of ballast involving improved type of ballast; vide
para 739 (ii) 3) The original cost (cost at debit of capital) of an asset other
than land, estimated if not known, replaced at the cost of Open Line
Works-Revenue; 4) The cost at debit of creation of an asset under works (other
than land) which is abandoned or disposed of without being replaced; Note -When
such an asset is subsequently replaced, the adjustment made is reversed
provided the cost of replacement is chargeable to the Depreciation Reserve Fund
according to Paragraphs 754 and 755, otherwise the reversal adjustments should
not be made but the cost of replacement should be allocated according to the
normal rules as if it were a new work. 5) All expenditure incurred on
modernization of Rolling Stock ; and 7 6) The cost of tools and plant specially
purchased, and of any posts specially created, for the supervision or
construction of a work in accordance with the provision of paragraph 776.
710.
Depreciation Reserve Fund is credited with - 1) The amount contributed annually
from the Railway Revenues; 2) The amount realized from the disposal of an asset
(cost at debit of Capital or Development Fund or similar funds) and the amount
realized from the disposal of materials released from a work replaced at the
cost of the Depreciation Reserve Fund; and 3) The amount of interest earned on
the balance of the Fund.
711.
Development Fund bears1) The cost of new works relating to amenities for
customers falling within one or more of the categories in the list in Note 2
(I) below, irrespective of the cost of work, 2) The full cost of replacement of
a work (falling within one or more of the categories in the list in note 2 (I)
below, where the original cost was charged to revenue, 3) The cost of all new
labour welfare works 4) The entire cost of unremunerative works, for
improvement of operational efficiency including addition to existing or new
works falling within one or more of the categories in the list Note 2 (III)
below; 5) The cost of any tools and plant specifically purchased and of any
posts specially created for the supervision or construction of a work in
accordance with the provisions of paragraph 776; 6) The original cost at debit
of Capital, estimated if not known, of an asset (falling within the categories
mentioned in Note 2 below) replaced at the cost of the Depreciation Reserve
Fund. I. Passenger and Other Railway Users’ Amenities : - 1) Provision of
overhead and/or ground level arrangements at stations for filling water in
carriages, water supply at stations for use of Passengers, including not only
general water supply arrangements which are used for providing water in
carriages but also purification plants installed, water coolerselectric or
otherwise-water trollies, etc., provided for use ofpassengers. 2) Provision of
waiting accommodation including reinforced cement concrete and other types of
benches at stations including extension or improvements 8 to existing
arrangements to meet the requirements of railway passengers. 3) Refreshment
Rooms, Retiring Rooms, and vendors, stalls of all descriptions at stations
provided for catering to railway passengers, except those which the vendors are
required by contract to provide at their own cost. 4) Provision or improvement
of latrines provided for railway passengers at stations. 5) Miscellaneous
improvements, viz., provision of seats, hedges, shade trees on platforms, at
stations to cater to the needs of railway passengers. 6) Provision of bathing
facilities at stations for use of passengers 7) Improvement to existing
carriages such as provision of fans, improved lighting and lavatories, special
insulation in roofs, bigger water tanks in carriages, better fitting etc.,
intended to provide improved facilities to railway passengers. Cost of
additional coaches to compensate the loss in seating capacity when old coaches
are replaced by new coaches which have a lower carrying capacity due to
provision of better facilities for passengers. 8) Improved lighting and
provision of fans on platforms or in waiting halls and sheds or vendors stalls
at stations to cater to the requirements of railway passengers. 9) Exhibition
of sheets time tables in glass fronted frames at station to serve the
requirements of passengers. 10) Computerization of Passenger Reservation System
(PRS). (Authority Railway Board's letter No.F(X)II-87/ALC/1 dated 09.09.1988)
11) Works under all the above heads meant to cater to railway passengers provided
in connection with Melas and required for periods exceeding 6 months. Note
-Works of this nature required for periods less than six months will be treated
as temporary and charged to Revenue under para 740. 12) Any other work
considered essential for meeting the requirements of railway passengers at any
station, eg., provision of information Offices or Kiosks, provision of public
announcement systems etc. 13) Provision including extensions and improvements
of the following to cater to the needs of other railway users in Goods Sheds
and Parcel Offices for Arrangements for drinking water including water coolers,
water trollies etc,Waiting accommodation, including provision of various types
of benches,Refreshment rooms and Vendors Stalls, except those that a contractor
has to provide at his own cost, Latrines, Miscellaneous improvements, namely;
provision of seats, hedges and shade trees,Lighting arrangements and provision
of fans,Any other work considered essential, e.g., Enquiry Offices / Information
Centres etc, Work under the above heads provided in connection with melas and
required forperiods exceeding 9 6 months. II. Staff Welfare Works Provision of
new hospitals, dispensaries and schools and additions, alterations and
improvements to existing ones, Provision of new institutes, recreation rooms,
swimming baths, sports grounds and reading rooms and improvements and additions
to the existing ones, Provision and improvement of health and welfare services,
child welfare and maternity centres, cooling arrangements for workshops,
canteens and rest rooms for workmen, Provision and improvement of sanitation,
water supply, roads, lighting and marketing facilities in railway colonies,
Improvements and alterations to existing quarters of whatever type. III. Un-remunerative
Works for improvement of Operational efficiency Works arising out of the need
for keeping operational methods up to the latest requirements and standards,
viz.-,Improvement in water supply at stations for loco traffic purposes,
Removal of infringements, Regrading permanent way and improving curves,
Converting dead-end sidings into through loops and the provision of additional
loops at stations, Provision, extension, realignment or modernization of
catch-sidings, Electric lighting of sheds and stations, whether new works or
improvements toexisting ones, Provision of guard rails on major bridges with
through or deck spans, Duplicating or strengthening girders by adding
materials, Additional earth work carried out in raising the roadbed in the approaches
to railway bridges on account of replacement of girders by others of greater
depth, Strengthening of track by inserting additional sleepers, Provision of
Anticreep Anchors, Fitting of automatic vacuum brake equipment to Metre Gauge
wagons, Telecommunication works and wireless installations, Accommodation works
not called for during the construction of a railway orfor the period thereafter
laid down in Section 11 of the Indian Railway Act, Schemes for remodelling of
station yards, workshops, sheds, stores depots and store yards, Improvements to
existing station buildings, sheds, godowns, etc, Improvements, extension and
additions to office buildings, Provision of, and improvements and additions to,
drivers and guards runningrooms and rest houses for officers, Provision for
fire fighting arrangements or equipment at stations, Provisions of washable
aprons on passenger platform lines, Opening of new flag stations or conversion
of halts into flag stations, as a passenger facility where there is no financial
justification, Provision or improvement of approaches and circulating areas at
stations including improved lighting, tonga-cartaxi-cycle-rikshaw stands to
cater to the requirements of railway passengers, Approach roads, circulating
areas, bullock and other cart sheds and water troughs etc. 10 IV. Safety Works
– Safety related works can be charged to Development Fund also. Note - A) A
work shall be considered to be remunerative for the purpose of this paragraph
if it earns the return stipulated in Para 204 B) The cost of plant and
machinery required for any of the above works should also be included in the
cost of the work for the purpose of the above rules. C) The works ‘Provision or
improvement of approaches and circulating areas at stations including improved
lighting, tonga-car-taxi-cyclerikshaw stands to cater to the requirements of
railway passengers, Approach roads, circulating areas, bullock and other cart
sheds and watertroughs etc’ which appear in the Pink Book for 1979-80 or were
approved separately during that year irrespective of whether they had been
commenced or not, will continue to be classified as "Passenger
Amenities" and ‘Other Railway Users Amenities’ respectively, Only new such
works included in 1980-81 budget and onwards will be treated as unremunerative
operating improvements.
712.
The Development Fund is credited with1) the amount transferred to it from the
Revenue Reserve Fund; 2) the amounts appropriated to it each year from the
surplus or otherwise 3) the cost at debit of the Development Fund of an asset
which is abandoned ordisposed of without being replaced; Note -When such an
asset is subsequently replaced, the adjustment made under these rules is
reversed provided the cost of replacement is chargeable to the Deprecation
Reserve Fund according to Paragraphs 754 and 755, otherwise the reversal
adjustment should not be made but the cost of replacement should be allocated
according the normal rules as if it were a new work. 4) the difference between
the cost at debit of the Development Fund of a replaced asset and the cost of
its replacement, when the cost of replacement is chargeable to the Depreciation
Reserve Fund (vide Paragraphs 754) and is less than the cost at debit of the
Development Fund; and 5) the amount of interest earned on the balance of the
Fund.
713.
If a work or scheme consists of several categories, some relating to amenities
for customers or labour welfare and other to operative improvements,
remunerative 11 or unremunerative, the allocation should be considered with
reference to the work or the scheme as a whole, except that the cost of such
item or items of the work or scheme as can be identified to be of the category
of amenities for passengers and other railway users should be charged to the
Development Fund.
714.
Deleted
715.
Deleted
715
A. Railway Safety Fund (RSF) bearsThe cost of projects under the following
Planheads (PH): i) Road Safety Works-Level Crossings, ii) Road Safety
Works-Road Over/Under Bridges, iii) New Lines iv) Gauge Conversion, v) Traffic
Facilities vi) Track Renewals, vii) Bridge Works, viii) Electrification, ix)
Customer Amenities & x) Metropolitan Projects.
715
B. Railway Safety Fund (RSF) shall be credited with: i) Funds received from
General Exchequer as Railway’s share out of Central Road & Infrastructure
Fund (CRIF) from cess levied on HSD oil and petrol etc, as per CRIF Act. ii)
Amounts to be appropriated from Railway Revenues i.e. out of the surplus after
appropriation to Development Fund and Capital Fund.
715
C. Extra Budgetary Resources (EBR) EBR(P): Cost sharing with State Government
for Plan Heads New Lines, Traffic Facilities, Road Safety Works, Other
Electrical Works (incl TRD) and Customer AmenitiesAnother component of EBR is
EBR-Partnership which captures the investments made by third parties on the
railway network and includes sidings, private freight terminals, contributions
of state governments in joint venture projects, loans directly provided to
Railway companies for which IR stands as guarantor, etc. EBR (IF): A new source
of fund was introduced in the Railway Budget 2015-16 for financing projects.
The funds are borrowed from institutional sources so as to ensure availability
for completion of projects critical for the Railways for generation of
revenues.EBR(IF) allocations would be utilized for priority works under Plan
Heads New 12 Lines, Gauge Conversion, Doubling, Traffic Facilities, Railway
Electrification, S&T etc with a view to enhancing throughput on the
congested corridors. EBR (IRFC-Bonds): Allocation of Business Rules of GOI
allow only MOF to borrow funds for GOI finances. For supplementing funds to
finance Railway Budget, the finance arm of Indian Railways, i.e. Indian Railway
Finance Corporation does the borrowings. These funds are utilized primarily for
procurement of rolling stock, which is then leased to IR for a fixed period. IR
pays lease charges to IRFC - both principal and interest components. After the
lease period the assets are handed over to Railways at an agreeable amount.
715
D. RRSK: ‘Rashtriya Rail Sanraksha Kosh’ (RRSK) was created in 2017-18 for a
period of five years (as extended from time to time by MoF) to fund critical
safety related works. This fund will be utilized for financing identified works
under Plan heads Track Renewal, Bridge Works, Signal & Telecom Works, Road
Safety works of Level Crossings and Road Over/Under Bridges, Rolling Stock,
Traffic Facilities, Electrical Works, Machinery and Plant, Workshops, Passenger
Amenities and Training/HRD.
716.
The following detailed rules regulate the allocation of expenditure in
particular cases and are intended to be illustrative of the application of the
basic principles in practice.
717.
Land -Land taken up permanently, whether for works or Revenue purposes of the
railway is charged irrespective of cost to Capital All charges incidental to
the acquisition of land are included in the cost of land. Note -Incidental
charges are defined in the "Explanatory Note 1120" against' Land' in
Appendix II of Volume II of this code.
718.
The cost of land provided free to subsidized railways is debited to the minor
head “Subsidized Companies" under major head 345-Indian Railways Policy
Formulation, Direction, Research and other Miscellaneous Organisations. No
readjustment to capital is allowed after such a railway is purchased by
Government.
719.
The cost of land required for the acquisition of materials by quarrying,
mining, boring, or other operation; and payments for royalty, mining rights,
etc., connected with the same, is dealt with as part of the cost of the
manufacturing operations or charged off finally to the work concerned.
720.
Rent or other miscellaneous charges in connection with the hire of land,(e.g.,
the compensation payable for land acquired temporarily under Section 35 of the
Land Acquisition Act of 1894) are charged to the work concerned.
721.
The cost of filling up burrow pits as a conservancy measure is chargeable to
Revenue. When the filling up of borrow pits is necessitated by the construction
of a new work, the cost of filling up should be allocated to the work
concerned.
722.
When land, originally acquired at the cost of capital, is sold or surrendered,
the sale proceeds are in all cases credited to Capital.
723.
When land is lost through erosion, its cost is written back from Capital to
Revenue. If the land so washed away subsequently reforms and is used by the
Railway, the adjustment originally made between Capital and Revenue is
reversed.
724.
Surveys -The expenditure incurred on a survey project is in the first instance
charged to the head “3001-A Indian Railways Policy Formulation, Direction
Research and other Miscellaneous Organizations (Miscellaneous Expenditure
General)" and when the construction of the project is undertaken it is
transferred to the project concerned, irrespective of the year in which the
expenditure was originally incurred. Note -If the adjustment of such
expenditure involves large amounts, it may be considered specially in
consultation with Audit. Railway Board Authority 2023/F(X)II/10/44 dated
19.01.2024 (ACS No 02)
725.
New lines -The allocation of expenditure on new lines after the date of
opening, but before the closing of the completion estimate, is regulated by the
rules in paragraphs 726 to 732.
726.
The cost of completing works which were incomplete on the date of opening and
of works which, though commenced after that date may properly be considered as
forming essential parts of first equipment, is charged to Capital.
727.
During the period for which such works remain incomplete, the cost of their
maintenance, replacement or renewal is also charged to Capital, provided the
maintenance, replacement or renewal becomes necessary directly out of their
incomplete state.
728.
The cost of maintenance of works which were complete on the date of opening is
charged to Revenue. The cost of their replacement or renewal is allocated to
Depreciation Reserve Fund according to the provisions of paragraph 754 et c.
For the purpose of this rule a work is considered to be "complete"
only when, for the first time, it conforms in all respects to its accepted specification.
729.
A few instances are given below to elucidate further the principles enunciated
14 in paragraphs 726 to 728.
730.
Cess repairs and earthwork for banks undertaken immediately after the opening
of a line, while the construction estimate is still open may be regarded as
works necessary to complete the bank, chargeable to Construction Estimate and
debitable to Capital.
731.
Ballast and permanent way are regarded as "complete" when they are
laid to the accepted specification and any subsequent packing or other work
that becomes necessary after opening of the line should he charged to Revenue.
732.
Repairs to bridge bed blocks, training works, protective works, mile-stones,
engine sheds, water columns and quarters which have been completed to
specification, and are capable of being put to the use for which they were
intended, are chargeable to Revenue irrespective of whether they were actually
so used or not. If works were not complete as defined above, the costof repair
is chargeable to Capital.
733.
Lines partially opened for traffic- Subject to the provisions of Rule 727 in
regard to the maintenance of incomplete works, the maintenance charges of a
line, or a portion of a line which has been opened for traffic but the
maintenance of which continues to be supervised by construction staff should be
allocated as follows. Such of the charges as can be identified as directly
allocable to the line or portion of the line opened for traffic should be
debited to Revenue. The cost of supervising and miscellaneous staff and other
miscellaneous expenditure, which is not so identifiable, should be distributed
between Capital and Revenue in the ratio which the total Capital expenditure,
both on opened and unopened portion of the line, bears to Revenue expenditure on
the portion opened to traffic plus Revenue earnings of that portion. So for as
the maintenance of permanent way is concerned, the debit to Revenue in respect
of expenditure not so identifiable, may be arrived at on an estimated basis
having regard to the expenditure on the maintenance of a line similarly
located. Note -The term 'Capital expenditure' in this Paragraph means 'gross'
expenditure, ignoring any credits for the value of released materials.
734.
Deleted
735.
Deleted
736.
Deleted
737.
Cost of Office Equipment and other office Appliances, Tools and Plants -Cost of
Office appliances and machines such as Personal Computers, Xerox 15 machines,
Fax machines, small tools and plants (costing upto Rs 1 lakh individually)
should be charged to revenue, except when this is required to be booked under
Capital or Depreciation Reserve Fund or Development Fund etc, as per provisions
of Para776, Note -Personal Computers, upto Rs.1 lakh only will be treated as
Office appliances. This rule will not, however, apply to computers of higher
configuration, viz, Mainframes etc. or PCs , machines and other office
appliances chargeable to works estimates. (Authority: Board's letter No.
2011/F(X) II/5/11 dated 08.09.2016).
738.
Revenue Sidings- The cost of sidings required purely for revenue purposes e.g.
ballast and fuel sidings are charged to Revenue.
739.
Additions of Ballast- Except when connected with the relaying of permanent way
and/or replacement of, and changes in, the type of sleepers, the cost of
additions, of ballast shall be charged— i) to revenue (a) when ballast is added
after three years of the opening of a line; (b) when there is an increase in
the depth of ballast for the purpose of maintaining the requisite depth; Note
-Cost of ballasting an unballasted line within three years of its opening will
follow the allocation of the original construction estimate. ii) to
Depreciation Reserve Fund when there is an improvement in the type of ballast
(e.g. when sand or moorum ballast is replaced by stone ballast) or when the
depth of ballast is increased beyond the normal prescribed depth to comply with
the revised track standards. If the additions or improvements are so connected
with the relaying etc, the supply of additional or improved ballast should form
an integral part of the operation of and be combined with the “ Permanent Way”
portion of the estimate for relaying and replacement for the purpose of
allocation. Note -1) the word “Improvements” occurring in this sub-Paragraph
includes “renewals” 2) the expression "connected with the relaying"
should be taken to mean strictly only where ballasting is a necessary and
integral part of relaying, but when relaying is taken as an occasion to
simultaneously add to the ballast, it should not be held that the ballasting is
connected with the relaying.
740.
Temporary and Experimental Works- The cost of a temporary or experimental work
is chargeable to Revenue. When, however, it ceases to be 16 temporary or
experimental and becomes permanent, or is replaced by a permanent work, the
actual cost of the work should be transferred to the debit of fund in works.
741.
Maintenance of Quarters for Construction Staff- When quarters built as part of
important open line works in progress and not handed over to be managed by the
open line, are occupied by the open line staff, the rent realized shall be
credited and the cost of repairs and maintenance debited to revenue. But when
such quarters or occupied by construction staff, the rent will be credited to,
and the cost of repairs and maintenance of such quarters even if vacant should
be debited to, the project.
742.
Rolling Stock- All first equipment of rolling stock for a line of railway is
chargeable to Capital/EBR (IRFC-Bond). Whether an item of rolling stock
provided otherwise than as first equipment is to be accounted for as an
addition or as a replacement or renewal shall be decided according to the
following principles.
743.
Renewals must always take precedence of “ Additions”
744.
When additions are made to the Rolling Stock of any class authorised for the
Railway, the cost of such additions should be charged to Capital. However, as
an exception to this, the cost of new coaches procured to make good the loss in
the seating capacity of replaced coaches due to the provision of additional
facilities for the passengers in the new coaches (though they are treated as
additions to the authorised stock for the Railway) should be charged to the
Development Fund in accordance with item 7 of List “A” below Note (2) under
para 711.
745.
No new rolling stock should be charged to Capital as additions, if the actual
stock of that class in existence on the line is below the authorized stock for
the railway, when additions to rolling stock are made under classes in respect
of which there has previously been a reduction in authorized stock, the new
stock should be considered to have replaced the stock previously reduced.
746.
The following are the classes into which rolling stock is divided for the
purposes of the preceding paragraph, but if there is any doubt whether a
particular item belongs to one class or another, the decision of the Railway
Board should be obtainedClass Particulars 1) Locomotives, diesel and battery.
2) Locomotives, electric. 3) Coaching stock ( suburban motor units). 4) Coaching
stock, self-propelled and trailers. 17 5) Saloons. 6) Tourist cars and
Restaurant cars. 7) Coaching stock, upper classes, including all vehicles in
which airconditioned or first class accommodation is provided. 8) Coaching
stock, including brake, luggage and postal in which second class accommodation
is provided. 9) Other coaching vehicles, including brake, luggage, postal,
motor, fruit, fish, poultry, duck (vans) and horse-boxes, in which no passenger
accommodation is provided. 10) Officers carriages 11) Service coaching
vehicles, including stores vans, tool vans, break down vans and subordinate
inspection carriages. 12) General service goods wagons, including open,
covered, low sided rail and timber trucks. 13) Acid, oil and petrol tank
wagons. 14) Other goods vehicles, including cattle wagons and explosive wagons.
15) Well wagons. 16) Goods brake-vans. 17) Service wagons, including ballast
hopper, crane support, crane and weigh bridge testing wagons, and water tank
wagons. 18) Mineral centre discharge hopper wagons. Note -The above represent
the maximum number of classes. A similar number of classes may be observed,
when deciding whether an item of new rolling stock is to be treated as an
addition or a replacement. Within each such class, the particular item of
rolling stock which should be considered as being replaced is that which
approximates most closely to the vehicle that is being provided on renewal
account. Where close approximation is impracticable or where difficulty arises
in determining what is the stock most closely approximating, due regard should
be paid to the consideration of eliminating any debit to capital that can be
avoided consistently with the adequacy of the replacement.
747.
The classification given in the preceding paragraph is intended to cover
ordinary cases where new stock of particular class is obtained, but when new
stock of a particular class supersedes actually old stock of another class, the
case should be referred to the Railway Board for orders on its individual merits.
748.
Railway administration shall maintain in the necessary detail, statistics of
Rolling Stock showing the figures separately for each class of rolling stock,
the numbers of the gross authorized stock, the reduction therein made from time
to time and the net authorized stock. 18
749.
Stand bys -For the purpose of this rule a "stand-by" is a complete
unit of machinery, plant or equipment which is kept in order to perform the
functions of the main unit of machinery, plant or equipment to which it is a
"stand-by" and with which it may be identifiable, when such unit is
put out of action temporarily on account of accident or periodical repairs, or
is required to assist when the main unit has to meet on overload. The cost of
such "stand-by" is chargeable to the head to which the machinery,
plant or equipment to which it is a "stand-by" is charged. A
"stand-by" does not include articles which have been replaced but
continue to give service as unauthorized stock or duplicates for some time
after.
750.
Spares -Other spare items of machinery, plant or equipment, whether complete
units or parts, which do not fulfil the conditions of the preceding paragraph,
such as boiler tubes, super heater element, armatures, valves, coils, etc.,
will be called "spares" for the purpose of rule. The cost of such
"spares" should, in all cases be brought on to the Stores Suspense
Account and charged to revenue when handed over to be retained in the custody
or issued to the using department. Exceptional cases where a debit to capital
is considered justifiable should be referred to the Railway Board for orders.
The following items have been admitted by the Railway Board as justifying a
charge to capital provided they cost individually more than the monetary limit
prescribed from time to time. a) spare boilers for each type of locomotive in
use, up to 7 percent of their totalauthorised stock of locomotives, intended to
accelerate engine repairs, b) spare boilers for watering arrangements at
stations and power-operated spare pumpingsets; and c) the items of spares of
circulatory nature for Diesel Locos /Rail Cars listed below whencosting the
monetary limit prescribed from time to time or more per loco set/rail car
should be charged to capital. List of spares for Diesel Locos / Diesel Rail
Cars to be charged to Capital. Diesels Electric--- 1) Diesel engine complete
with Generator. 2) Motor truck assembly complete with traction motors. 3)
Traction motors (BG/MG) 4) Traction Generators (BG/MG) Diesel Hydraulic – 1)
Diesel engine (Mak) 2) Suri transmission, 3) Reversing Gear Box. 19
751.
The items of spares for electric locos and EMU stock listed below when costing
the monetary limit prescribed from time to time or more each and not being of
the nature of consumable stores but intended to accelerate repairs should be
charged to Capital.- List of spares for Electric Locomotives and EMU Stock to
be charged to capital. Spares for Electric Locomotives 1) Bogies complete with
Traction Motors. 2) Main Transformers. 3) Traction Motor. 4) Tap changer. 5)
Silicon Rectifier Block. 6) Traction Motor Armature (as distinct from Traction
Motor). Spares for EMUs1) Main transformer. 2) Traction Motor. 3) Silicon
Rectifier Block. 4) Traction Motor Armature (as distinct from Traction Motor).
752.
The cost of spare starting resistances of D.C. Electric Locos will also be
charged to Capital in addition to 6 items of spares for electric locos listed
in para. 751.
752A.
Spare C & W bogies built with wheels and axles provided to facilitate and
expedite the out turn of coaches and wagons from the repair shops, has been
admitted by the Railway Board as justifying a charge to Capital provided they
cost individually more than the monetary limit prescribed from time to time and
held in shops/sheds as non-stock items with complete documentation.
753.
Replacement and Renewals--.After the date of opening of a line for traffic, the
cost of replacement or renewal of works or articles of equipment which were
complete on that date, is allocated in accordance with the rules in paragraphs
754 to 758. 754. Except as provided in paragraphs 703 (5) and 711 (2), the full
cost of replacement, including the improvement and inflationary elements, of an
asset should be charged to the Depreciation Reserve Fund. 20
755.
When the cost of replacement is chargeable to the Depreciation Reserve Fund and
is less than the original cost (cost at the debit of Capital or Development
Fund etc) ofthe assets replaced, which may be estimated if not known, the
entire cost of replacement should be charged to the Depreciation Reserve Fund
and difference between the original and the cost of replacement should be
credited to Capital or Development Fund etc as the case may be, by debit to the
Depreciation Reserve Fund.
756.
Deleted.
757.
If the original cost of an asset was partly debited to the Development Fund and
partly to Open Line Works-Revenue, the cost of replacement of such an asset
shall be allocated to the Depreciation Reserve Fund.
758.
For the purpose of paragraphs 754 and 755, a replacement or renewal to admit of
a debit to the Depreciation Reserve Fund must fall under one of the fo1lowing
categories.- 1) Renewals, including casual renewals of rails, sleepers and
fastenings, such as fishplates, fish-bolts, spikes, points and crossings,
tongue rails; 2) wholesale renewals or strengthening of bridges and girders; 3)
renewals of assets detailed in paragraphs 759 to 768 and 4) Renewals of all
assets except those detailed in the list appended below: a) Train lighting
equipment including dynamos, batteries and re-wiring (Electricequipment). b)
Locomotive fire-boxes. c) Locomotive fire-box plates. d) Locomotive axles. e)
Locomotive tyres. f) Locomotive cylinders. g) Component parts of wheels and
axles of carriages and wagons. h) All apparatus and appliances including
instruments and accessories for railwayhospitals and dispensaries. i) Floors
and roofs of buildings. j) Stair cases and side-walks of bridges. k) Ballast.
l) Re-wiring of high tension circuits of motor coaches of suburban electric
rollingstock. m) Flexible pinion assembly on the Electric Freight Locomotives.
When a renewal or replacement does not fall under any of the categories
detailed in 21 this rule, the cost of replacement will be borne by Revenue Note
- The cost of repairing flood damages, including the cost of repairing damages
to track caused by accidents, is chargeable to " Revenue, Maintenance and
Repairs", unless the repairs are associated with an element of betterment
when the cost should be charged to the Depreciation Reserve Fund.
759.
Renewals of rails, etc.-When renewal of track is proposed by different weight
of rail and different type of Sleeper, the amount chargeable to the
Depreciation Reserve Fund will either be the estimated original cost of the
material in the track or the full cost of replacement whichever is greater.
760.
When rails, which were second-hand when originally put in the line, are
replaced by new ones, the entire cost of replacement will be charged to the
Depreciation Reserve Fund.
761.
Deleted
762.
Deleted
763.
Deleted
764.
Renewals of Carriages and Brake-Vans- In the case of replacement of carriages,
one bogie should be taken as replacing two four-wheelers.
765.
Renewals of Self-propelled Coaches- When self-propelled coaches are replaced by
locomotives, the Cost at debit of capital in respect of the carriage portion
will be written off fromcapital by debit to the Depreciation Reserve Fund and
the cost of replacement, allocated to the Depreciation Reserve Fund in
accordance with the provision of paragraphs 754, 755 and 758.
766.
Renewals of wagons-In the case of replacement of wagons, one bogie should be
taken as replacing two 4-wheelers.
767.
When new stock is built on old underframes, only the depreciated value of the
underframes should be included in the cost of the new stock and the same amount
being credited to the Depreciation Reserve Fund as value received for released
materials.
768.
Renewals of Rolling Stock parts-The cost of renewals of complete wheels and
axles of carriages and wagons should be allocated to the Depreciation Reserve
Fund.
769.
Deleted
770.
When the motions, or in some cases the engine frames of locomotives, are
altered, the total cost is charged to Revenue.
771.
When small fittings are provided for locomotives incidental to conversions, the
total cost is charged to Revenue.
772.
Incidental Works-The allocation of temporary works and diversions, which are
incidental to a main work, follows that of the main work in connection with
which they are required, and where the main works are debitable partly to Capital
or the Development Fund etc and partly to the Depreciation Reserve Fund or
Revenue, their cost is allocated in rateable proportions.
773.
The cost of incidental works which are not essential for the execution of the
main work, but are required merely to maintain the earning revenue of the
railway at their normal level is chargeable entirely to Revenue.
774.
Incidental Charges -The cost of a work includes all charges directly connected
withthe work. Accordingly the freight on materials to the site of work and
charges for loading and unloading, dismantlement, shifting and relaying form
part of the cost of the work to which they are directly incidental and are not
separately chargeable to Revenue.
775.
Expenditure on Ceremonial Occasions -The expenditure incurred on ceremonial
occasions in connection with the opening of new lines or open line works shall
be charged to Revenue.
776.
Cost of Tools and Plants and Special Posts -No portion of the pay or allowances
of permanent open line staff shall be charged to estimates, when such staff is
employed on special works and the vacancies thus caused in the open line cadre
remain unfilled. The cost (less return value) of tools and plant specially
purchased and the cost of any posts specially created, for the supervision or
construction of a work chargeable purely to Capital or Depreciation Reserve
Fund or Development Fund or Open Line Works-Revenue, is debited to Capital,
Depreciation Reserve Fund, Development Fund, as the case may be. Where the cost
of work is chargeable partly to Capital or Development Fund, or Depreciation
Reserve Fund, the cost of such posts and tools and plants should be allocated
to Capital or Development Fund or Depreciation Reserve Fund, in the same
proportion in which the estimate for the work excluding the estimated cost of
tools and plant and special posts, is chargeable. For working out the
proportion, the gross amount of the estimate (ignoring the provision for
credits on account of released materials) should be taken into account. The cost
of a post, for the purpose of this rule includes the leave salary and
contributions towards passages, 23 pensions, provident fund, bonus and special
contribution to provident fund, which the holder of the post may be entitled
to. Note: The provision for credits on account of released materials to be
ignored in working out the proportion of cost of tools and plants and special
posts, should be the net credit in terms of paragraph 710 (2).
777.
Inter-Railway Transfer of Assets -When locomotives and other rolling stock are
transferred from an Indian Railway to a railway other than Indian Railways the
Depreciation Reserve Fund of the selling railway should be debited with the
original cost of the stock by creditto Capital and the Depreciation Reserve
Fund credited with the depreciated value of the stock, by debit to the railway
to which the stock is transferred, the depreciated value being arrived at
according to the following formula Then depreciated value (C) is: Wherea is the
sum of the years the stock has run, six months or less to be ignored and
morethan six months to count as one year; b is the sum of the years of its
normal life; c is the original cost of the stock or present day replacement
cost, whichever is greater Note (1) The value of any locomotive,carriage or
wagon shall not be at any time less than 25 percent of its original cost or
present day replacement cost, whichever is greater. (2) The cost of an engine,
when it is not known separately should be calculated on the following basis :-
Cost of engine for tender/tank engine = ¾/⅔ of the original cost or present day
replacement cost, whichever is greater, of the whole locomotive.
778.
The normal life of Rolling stock should, for the purposes of the preceding rule
be assumed to be as given under para 219, as modified from time to time.
779.
The example given below illustrates the formula prescribed in paragraph 777-
Example.-An engine, the original cost of which is Rs 12 Cr is transferred to
another railway after it has run for six years.- 24 a = 1+2+3+4+5+6 = 21. b =
1+2+3................ 40 = 820 C= 12,00,00,000 = 12,00,00,000 - 2304878 =
11,76,95,122
780.
When rolling stock is transferred from one Indian Railway to another such railway,
the original cost and the amount of depreciation, since purchase or since last
renewal if renewed, should both be transferred from the selling to the
purchasing railway without any financial adjustment, the cost of part renewals,
if any, actually charged to the Depreciation Reserve Fund being deducted before
transfer. The depreciation, for the purpose of this paragraph, should be
calculated on the basis of "normal life’’ as modified from time to time.
781.
Assets other than Rolling Stock -When assets other than rolling stock are
transferred from one Indian Railway to another such railway, adjustments, where
necessary, will be made between the selling and the purchasing railways in
accordance with paragraphs 703 to 715, the sale value being the market value as
may be mutually settled between the railways parties to the transaction as in
the case of disposal or sale of assets.
782.
Sale of overage or condemned locomotives and wagons -The sale price of overaged
or condemned locomotives and wagons shall be determined in accordance with the
following formula - Locomotives- (a) Scrap value, on weight basis, at
controlled rates, on the ferrous portion. Virgin metal value, at present day
prices, on non-ferrous portion, e.g., copper, brass, etc. The aggregate value
thus arrived at, to be raised by 25 per cent. (b) In addition to the sale
price, calculated as above, a proportion of the cost of periodical overhaul
given to the locomotives prior to their sale, should also be included therein.
This should be determined in accordance with the formula given below - Cost of
periodical overhaul X Average kilometrage between 2 periodical overhauls -
Kilometrage done by engine since last periodical overhauls Average kilometrage
between 2 periodical 25 overhauls Wagons- Scrap value at controlled rates
excepting for serviceable parts e.g., wheels and axles, springs, draw gear,
buffing gear, brake gear, etc., for which 50 percent of the present day prices
should be added. The aggregate value thus arrived at should be raised by 25
percent to arrive at the sale price. Subject to the minimum as fixed above, the
actual sale price should be settled in each case depending on the working
condition of the unit. Note -This Formula relating to wagons does not apply to
wagon bodies (i.e. condemned wagons after stripping useful fittings) sold by
auction.
783.
Transfers of assets from ‘Open Line’ to 'Construction' -When an asset borne at
the debit of Capital or Development Fund or any other such fund is transferred
from Open Line to Construction, the original cost of the asset should be
written back from Capital or Development Fund or any other such fund to the
Depreciation Reserve Fund and the depreciated value of the asset deviated to
the construction estimate by credit to the Deprecation Reserve Fund.
784.
Replaced Stock -Credits for Rolling stock, replaced but kept running on the
lines should be afforded to the Depreciation Reserve Fund only when the stock
is actually broken upor returned to the store depot or other wise disposed of.
785.
When parts of an engine or vehicle which is borne on the “ replaced stock”
list, are to be used in construction of new stock, the present value of
material so used shall be included aspart of the cost of the new stock, the
Depreciation Reserve Fund receiving credit to that extent.
786.
The cost of all additions and alterations which may be required to be made in
the replaced stock to render it suitable for the purpose for which its
retention was intended, should be charged to revenue. Vehicles converted into
those of a different class do not come under this rule and incidence of the
cost of conversion follows the ordinary rules.
787.
Second-hand Rails -When second-hand rails, released from existing lines are
supplied to new projects or other administrations, their price is determined
according the formulaprescribed below: - Price per ton = R - N/L ( R-S ) Where
- 26 R. is the present day price of new rails of the section in questing
(exclusive of freight charges) N. is the age of the rails; L is the estimated
life of the rail; and S is the scrap value of the rail L should be taken as
prescribed but is subject to variation in cases where the Chief Engineer
considers that it is not a fair estimate of the life; and S should be taken at
40 percent of the present day price of new rail unless there are special reason
to hold that, at the time of transfer of the rails, the value so arrived at
diverges considerably from the current market rates for such scrap when the
value may be fixed on the basis of rates obtained for large quantities at
recent sales.
788.
Private Railways worked by Indian Railways - The detailed rules in foregoing
paragraphs of this chapter are generally applicable to expenditure on private
lines worked by Indian Railways except in so far as they may be inconsistent
with the provisions of the contract between the Government and party owning the
railway, when the provision of the contract shall prevail. The important
deviations from rules in this chapter which the contracts generally provide for
are— a) Petty works, can be grouped together for the purpose of debiting the
aggregate cost of such works to capital when they are included in a group of
petty works, none of which can be carried out or is effective for the purpose
for which intended independently of the construction of others, or when the
works are connected by the same general idea and are undertaken at or about the
same time as a part of general scheme. b) The cost of trial stations is charged
to capital. It is written back to revenue if the station is eventually
abandoned. c) The original cost of an abandoned work ordinarily remains at the
debit of capital. When the work is demolished or sold, Capital pays for the
demolition and receives credit for the sale proceeds or the value of the
material recovered, as the case may be. When assisted sidings are abandoned,
revenue is charged with any balance of the cost, which may remain at debit of
Capital after the sidings have been dismantled.
Multiple choice questions:
1.What does 'Allocation' of
expenditure imply in the context of Indian Railways?
- A) Classification of expenditure into various
categories
- B) Identifying the source of finance for the
expenditure
- C) Allocation of funds to different railway zones
- D) Distribution of revenue among various departments
Answer: B) Identifying the source of
finance for the expenditure
2.Which of the following is not a
source of financing railway expenditure?
- A) Capital provided by General Revenues
- B) Railway Funds
- C) Extra Budgetary Resources (EBR)
- D) Public Private Partnerships (PPP)
Answer: D) Public Private
Partnerships (PPP)
3.According to the Indian Railway
Code, what does 'classification' deal with?
- A) Distribution of funds to different railway projects
- B) Identification of the source of finance
- C) Detailed heads of account under which expenditure is
recorded
- D) Allocation of resources between passenger and
freight services
Answer: C) Detailed heads of account
under which expenditure is recorded
4.Which of the following is not
included in the sources of railway expenditure allocation?
- A) Depreciation Reserve Fund
- B) Development Fund
- C) Pension Fund
- D) EBR (IRFC-Bonds)
Answer: C) Pension Fund
5.What is credited to Capital
when an asset is abandoned or disposed of without being replaced?
- A) The cost of new asset acquisition
- B) The cost at debit of Capital of the asset
- C) The revenue from the sale of the asset
- D) The depreciation cost of the asset
Answer: B) The cost at debit of
Capital of the asset
6.Which fund is credited with the
amount appropriated annually from Railway Revenues?
- A) Depreciation Reserve Fund
- B) Development Fund
- C) Capital Fund
- D) Revenue Reserve Fund
Answer: A) Depreciation Reserve Fund
7.Which component does the
Railway Safety Fund (RSF) not cover?
- A) Track Renewals
- B) Bridge Works
- C) Customer Amenities
- D) Employee Salaries
Answer: D) Employee Salaries
8.What is the purpose of the
'Rashtriya Rail Sanraksha Kosh' (RRSK)?
- A) To fund new railway lines
- B) To finance critical safety-related works
- C) To improve passenger amenities
- D) To enhance freight services
Answer: B) To finance critical
safety-related works
9.What is the cost of filling up
borrow pits as a conservancy measure chargeable to?
- a) Capital
- b) Revenue
- c) Depreciation Reserve Fund
- d) Development Fund
Answer: b) Revenue
10.If land originally acquired at
the cost of capital is sold, to which account are the sale proceeds credited?
- a) Revenue
- b) Depreciation Reserve Fund
- c) Capital
- d) Development Fund
Answer: c) Capital
11.What should be done when land
is lost through erosion?
- a) The cost is written back from Revenue to Capital
- b) The cost is written back from Capital to Revenue
- c) The cost is charged to Development Fund
- d) The cost is ignored
Answer: b) The cost is written back
from Capital to Revenue
12.How is the expenditure on
survey projects initially charged?
- a) To the project concerned
- b) To the Depreciation Reserve Fund
- c) To "3001-A Indian Railways Policy Formulation,
Direction Research and other Miscellaneous Organizations (Miscellaneous
Expenditure General)"
- d) To Revenue
Answer: c) To "3001-A Indian
Railways Policy Formulation, Direction Research and other Miscellaneous
Organizations (Miscellaneous Expenditure General)"
13.Where should the cost of
maintenance of works that were complete on the date of opening be charged?
- a) Capital
- b) Depreciation Reserve Fund
- c) Development Fund
- d) Revenue
Answer: d) Revenue
14.When is the cost of office
appliances such as personal computers charged to Revenue?
- a) Always
- b) When the cost is above Rs 1 lakh
- c) When the cost is up to Rs 1 lakh
- d) When they are part of works estimates
Answer: c) When the cost is up to Rs
1 lakh
15.What should be done when
additions or improvements to ballast are connected with the relaying of
permanent way?
- a) Charged to Revenue
- b) Charged to Depreciation Reserve Fund
- c) Charged to Capital
- d) Charged to Development Fund
Answer: b) Charged to Depreciation
Reserve Fund
16.How is the cost of a temporary
or experimental work charged?
- a) Capital
- b) Depreciation Reserve Fund
- c) Development Fund
- d) Revenue
Answer: d) Revenue
17.Where is the cost of
maintenance and repairs of quarters for construction staff debited if the
quarters are not handed over to the open line?
- a) Revenue
- b) Capital
- c) Project concerned
- d) Development Fund
Answer: c) Project concerned
18.To which fund is the cost of
new coaches procured to make good the loss in seating capacity due to
additional facilities charged?
- a) Revenue
- b) Capital
- c) Development Fund
- d) Depreciation Reserve Fund
Answer: c) Development Fund
19.When should new rolling stock
not be charged to Capital as additions?
- a) When the actual stock of that class is above the
authorized stock
- b) When the actual stock of that class is below the
authorized stock
- c) When new stock replaces old stock
- d) When the stock is considered temporary
Answer: b) When the actual stock of
that class is below the authorized stock
20.Which class of rolling stock
includes diesel and battery locomotives?
- a) Coaching stock
- b) General service goods wagons
- c) Locomotives, diesel and battery
- d) Service wagons
Answer: c) Locomotives, diesel and
battery
21.What is the correct
classification for tourist cars and restaurant cars in the list of rolling
stock classes?
- a) Class 3
- b) Class 5
- c) Class 7
- d) Class 6
Answer: d) Class 6
22.Who should decide if there is
doubt about the classification of a particular item of rolling stock?
- a) Railway Administration
- b) The Railway Board
- c) Depreciation Reserve Fund Committee
- d) Open Line Works Committee
Answer: b) The Railway Board
23.What should be done with the
cost of "stand-by" units of machinery, plant, or equipment?
- a) Charged to Revenue
- b) Charged to the head of the main unit
- c) Charged to Capital
- d) Charged to the Development Fund
Answer: b) Charged to the head of the
main unit
24.Where should spare items of
machinery, plant, or equipment that do not fulfill the "stand-by"
conditions be charged initially?
- a) Revenue
- b) Depreciation Reserve Fund
- c) Stores Suspense Account
- d) Development Fund
Answer: c) Stores Suspense Account
25.Which item is included in the
list of spares for Diesel Locos/Diesel Rail Cars to be charged to Capital?
- a) Boiler tubes
- b) Suri transmission
- c) Silicon Rectifier Block
- d) Bogies complete with Traction Motors
Answer: b) Suri transmission
26.Which of the following is
charged to Capital for Electric Locomotives?
- a) Train lighting equipment
- b) Flexible pinion assembly
- c) Locomotive fire-boxes
- d) Main Transformers
Answer: d) Main Transformers
27.For what purpose is the cost
of spare starting resistances of D.C. Electric Locos charged?
- a) Revenue
- b) Depreciation Reserve Fund
- c) Capital
- d) Development Fund
Answer: c) Capital
28.When is the full cost of
replacement, including improvement and inflationary elements, charged to the
Depreciation Reserve Fund?
- a) Always, regardless of the nature of the replacement
- b) Only when the original cost is known
- c) Except as provided in specific rules
- d) Only for rolling stock items
Answer: c) Except as provided in
specific rules
29.What should be done if the
cost of replacement is less than the original cost of the asset?
- a) The difference should be credited to Capital or
Development Fund
- b) The full replacement cost should be charged to
Revenue
- c) The cost should be shared between Revenue and
Depreciation Reserve Fund
- d) The difference should be written off
Answer: a) The difference should be
credited to Capital or Development Fund
30.Where is the cost of renewing
rails that were second-hand when originally installed charged?
- a) Capital
- b) Development Fund
- c) Revenue
- d) Depreciation Reserve Fund
Answer: d) Depreciation Reserve Fund
31.In the case of replacing
carriages, how is one bogie considered in terms of replacing four-wheelers?
- a) As replacing one four-wheeler
- b) As replacing two four-wheelers
- c) As replacing three four-wheelers
- d) As replacing four four-wheelers
Answer: b) As replacing two
four-wheelers
32.Which spares are included in
the list for EMUs to be charged to Capital?
- a) Locomotive axles
- b) Floors and roofs of buildings
- c) Main transformer
- d) Boiler tubes
Answer: c) Main transformer
33.Where should the cost of
repairs for flood damages be charged if associated with an element of
betterment?
- a) Revenue
- b) Depreciation Reserve Fund
- c) Capital
- d) Development Fund
Answer: b) Depreciation Reserve Fund
34.What
should be done when self-propelled coaches are replaced by locomotives?
- A) Debit the cost to the Revenue Fund
- B) Write off the carriage portion from capital by
debit to the Depreciation Reserve Fund
- C) Charge the entire cost to Capital
- D) Credit the cost to the Open Line Works Fund
- Answer:
B) Write off the carriage portion from capital by debit to the
Depreciation Reserve Fund
35.In
the case of wagon replacements, how is one bogie considered?
- A) As a replacement for one 4-wheeler
- B) As a replacement for two 4-wheelers
- C) As an addition to the existing stock
- D) As a separate category
- Answer:
B) As a replacement for two 4-wheelers
36.When
new stock is built on old underframes, what should be included in the cost of
the new stock?
- A) The full value of the old underframes
- B) The depreciated value of the old underframes
- C) No value should be included
- D) The replacement cost of new underframes
- Answer:
B) The depreciated value of the old underframes
37.Where
should the cost of renewals of complete wheels and axles of carriages and
wagons be allocated?
- A) Capital Fund
- B) Revenue Fund
- C) Depreciation Reserve Fund
- D) Open Line Works Fund
- Answer:
C) Depreciation Reserve Fund
38.What
is the allocation for the total cost when the motions or engine frames of
locomotives are altered?
- A) Capital
- B) Depreciation Reserve Fund
- C) Revenue
- D) Development Fund
- Answer:
C) Revenue
39.What
is charged to Revenue in the case of small fittings provided for locomotives
incidental to conversions?
- A) The full cost
- B) Half the cost
- C) No cost
- D) The cost is allocated to the Development Fund
- Answer:
A) The full cost
40.How
are incidental works not essential for the execution of the main work charged?
- A) To Capital
- B) To Revenue
- C) To Depreciation Reserve Fund
- D) To Open Line Works Fund
- Answer:
B) To Revenue
41.What
should be included in the cost of a work?
- A) Only material costs
- B) Only labor costs
- C) All charges directly connected with the work
- D) Only administrative costs
- Answer:
C) All charges directly connected with the work
42.How
is the expenditure on ceremonial occasions in connection with the opening of
new lines or open line works charged?
- A) To Capital
- B) To Revenue
- C) To Depreciation Reserve Fund
- D) To Development Fund
- Answer:
B) To Revenue
43.When
an asset borne at the debit of Capital is transferred from Open Line to
Construction, where should the original cost be written back from?
- A) Revenue Fund
- B) Capital or Development Fund
- C) Depreciation Reserve Fund
- D) Open Line Works Fund
- Answer:
B) Capital or Development Fund
44.What
happens to rolling stock that has been replaced but kept running on the lines?
- A) It is credited to Revenue
- B) It is credited to the Depreciation Reserve Fund
when actually broken up or disposed of
- C) It remains in the Capital Fund
- D) It is transferred to the Development Fund
- Answer:
B) It is credited to the Depreciation Reserve Fund when actually broken
up or disposed of
45.How
should the cost of all additions and alterations made in the replaced stock be
charged?
- A) To Revenue
- B) To Capital
- C) To the Depreciation Reserve Fund
- D) To the Open Line Works Fund
- Answer:
A) To Revenue
46.What
is the price determination formula for second-hand rails released from existing
lines?
- A) Present day price of new rails + freight charges
- B) Scrap value at 40% of present day price + freight
charges
- C) R - N/L ( R-S )
- D) Original cost + depreciation
- Answer:
C) R - N/L ( R-S )
47.What
must be done when locomotives and other rolling stock are transferred from an
Indian Railway to a railway other than Indian Railways?
- A) Credit the selling railway's Depreciation Reserve
Fund with the depreciated value
- B) Debit the purchasing railway with the original cost
- C) Charge the full cost to the Open Line Works Fund
- D) No financial adjustment is necessary.
- Answer:
A) Credit the selling railway's Depreciation Reserve Fund with the
depreciated value
48.What
should be done when assets other than rolling stock are transferred from one
Indian Railway to another?
- A) The sale value should be the market value mutually
settled
- B) No financial adjustment is necessary
- C) The original cost is written off
- D) Charge the full cost to the Development Fund
- Answer:
A) The sale value should be the market value mutually settled
Comments
Post a Comment